Electrical Design Philippines

Complete Electrical System Wiring and Design

An electrical installation for new builds is consists of hundreds of components and products that must be properly chosen and installed. This will result in proper and safe operation as well as very few maintenance and repairs in the future.

For an electric fit out to be efficient, it is essential to conduct a study duly prepared by qualified professionals. Architects and civil engineers focusing on residential purposes will prevent people and assets from being endangered.

RMJE Construction Services Corporation have been providing specialist Engineering Design to power utilities, land developers, builders, construction company and other industries for over 20 years now.

Let’s talk about your plans

Ready to build your new house or renovate your store? We are here to help.





    Why Is Electrical Design Important

    1. Electrical design is required to help save money in the long run. Opting for these services can help save on energy bills and extend equipment life by optimizing equipment usage.

    2. Throughout the Philippines, the number of accidents caused by overload or short circuit has increased. Most of the time, these accidents are generated by poor and incorrect electrical installations.This is quite common in homes, mainly due to lack of information. Among the main causes of short circuits are the aging of the power grid, which is often old and needs maintenance. In addition, there is also the misuse of electrical outlets, which are overloaded due to the excessive number of equipment connected to it.

    RMJE Construction Services
    RMJE Construction Services

    Electrical Contractor Process

    An electrical project initially consists of qualitative and quantitative determination of the material used. This step takes into account the area of ​​the site, the function, the number of outlets, the number of , and the movement of people. Upon completion of the project, the technician has all the information necessary to perform the installation.poerThe project consists of 8 steps

    1. Floor Plan Analysis

    The floor plan analysis of the site can measure the number of lighting needed. In addition, it is important and necessary to know the perimeter and of each area, as determining the amount of socket points depends on this information.

    2 . PTUE’S and Supply

    Specific use points (PTUE’S) do not follow a specific standard. They depend on the device and its location. The determination of the minimum required is based on the sum of the active powers of all points.

    3. Determination of electrical circuits

    For safety reasons, circuits have an average of 10A (ampere) current. Thus, its maximum current may have only one circuit with a high power device, such as air conditioning. In addition, it is recommended to separate the lighting circuits from the socket circuits.

    4. Check distribution board location

    After determining the location of the switchboard, the power of consumption points is defined.

    5. Electric Current

    In order to determine the electric current mathematical formulas are used, avoiding circuits with more than 10 A.

    6. Circuit Breaker Sizing Applied to Mediator Board

    The type of circuit breaker depends on the type of supply and type of distribution system of the local utility company.

    7. Electrical Point Rental Plant

    After finalizing the power board, the electrical part is checked. In the rental plant there are all lighting points, general use and specific use points.

    8. Single Line Diagram

    Finally, the single-line diagram represents the trajectory of points and devices. The diagram shows the utility power, the mediation board, the distribution board, and the end circuits. The goal is to quickly check how many conductors will pass through certain conduits, in addition to their path.